Skip to main content
NSF NEON, Operated by Battelle

Main navigation

    • About Overview
    • NEON Overview
    • About the NEON Biorepository
    • Observatory Blog
    • Newsletter
    • Staff
    • FAQ
    • User Accounts
    • Contact Us
    • Data Overview
    • Data Portal
    • Data Availability Charts
    • API & GraphQL
    • Prototype Data
    • Data Collection Methods
    • Getting Started with NEON Data
    • Using Data
    • Data Notifications
    • NEON Data Management
    • Samples & Specimens Overview
    • NEON Biorepository Sample Portal at ASU
    • About NEON Samples
    • Sample Types
    • Finding and Accessing Sample Data
    • Species Checklists
    • Requesting and Using Samples
    • Acknowledging and Citing the NEON Biorepository
    • Biorepository Research Projects
    • Field Sites Overview
    • Field Site Map and Info
    • Spatial Data Layers & Maps
    • Resources Overview
    • Getting Started with NEON Data
    • Research Support Services
    • Code Hub
    • Learning Hub
    • Science Seminars and Data Skills Webinars
    • Document Library
    • Funding Opportunities
    • Impact Overview
    • Research Highlights
    • Papers & Publications
    • NEON in the News
    • Get Involved Overview
    • Upcoming Events
    • Past Events
    • Research and Collaborations
    • Advisory Groups
    • NEON Ambassador Program
    • Partnerships
    • Community Engagement
    • Work Opportunities

Search

About

  • NEON Overview
  • About the NEON Biorepository
  • Observatory Blog
  • Newsletter
  • Staff
  • FAQ
  • User Accounts
  • Contact Us

Breadcrumb

  1. About
  2. Observatory Blog
  3. Delay in analysis of external lab surface water and groundwater nutrient data

Data Notification

Delay in analysis of external lab surface water and groundwater nutrient data

January 25, 2021

Based on an analysis of nutrient data, NEON has determined that the method detection limits (MDLs) required of the external laboratory for surface water and groundwater nutrient analyses are too high for many sites. Over 10% of reported nutrient data were below the detection limit for many sites.

Currently, sub-samples for nutrient analysis are being frozen and stored for future analysis using a method with a lower MDL. The analysis of these frozen nutrient samples will take place following procurement of a new contract with lower MDLs, which may take several months. An update will be provided by April 20th, 2021.

This delay impacts the following analytes: nitrate plus nitrite as nitrogen (NO3+NO2 – N), nitrite as nitrogen (NO2 - N), ammonium as nitrogen (NH4 - N), orthophosphate (Ortho - P), total phosphorus (TP), and total dissolved phosphorus (TDP). Total dissolved nitrogen (TDN) and total nitrogen (TN) are not impacted by this delay and will be analyzed and published as expected.

Users should refer to the swc_externalLabSummaryData table, which is part of the expanded package for both Chemical properties of surface water (DP1.20093.001) and Chemical properties of groundwater (DP1.20092.001), for details of laboratory method detection limits associated with date ranges for previously analyzed data.

Please use the Contact Form for further inquiries; please select DP1.20093.001 (for surface water) or DP1.20092.001 (for groundwater) in the Data Product drop-down list and include the term "RITM0030592" in the body of your request.

Share

Related Posts:

Rapid Habitat Assessment and AIS Site Survey removed from Stream morphology map (DP4.00131.001) and split into two new Data Products

October 13, 2026

New date-time columns added to sensor positions file in Instrument System downloads

September 21, 2026

Sample-associated imagery now available through the NEON Biorepository

August 26, 2026

NSF NEON, Operated by Battelle

Follow Us:

Join Our Newsletter

Get updates on events, opportunities, and how NEON is being used today.

Subscribe Now

Footer

  • About Us
  • Contact Us
  • Terms & Conditions
  • Careers
  • Code of Conduct

Copyright © Battelle, 2026

The National Ecological Observatory Network is a major facility fully funded by the U.S. National Science Foundation.

Any opinions, findings and conclusions or recommendations expressed in this material do not necessarily reflect the views of the U.S. National Science Foundation.