Skip to main content
NSF NEON, Operated by Battelle

Main navigation

    • About Overview
    • NEON Overview
    • About the NEON Biorepository
    • Observatory Blog
    • Newsletter
    • Staff
    • FAQ
    • User Accounts
    • Contact Us
    • Data Overview
    • Data Portal
    • Data Availability Charts
    • API & GraphQL
    • Prototype Data
    • Data Collection Methods
    • Getting Started with NEON Data
    • Using Data
    • Data Notifications
    • NEON Data Management
    • Samples & Specimens Overview
    • NEON Biorepository Sample Portal at ASU
    • About NEON Samples
    • Sample Types
    • Finding and Accessing Sample Data
    • Species Checklists
    • Requesting and Using Samples
    • Acknowledging and Citing the NEON Biorepository
    • Biorepository Research Projects
    • Field Sites Overview
    • Field Site Map and Info
    • Spatial Data Layers & Maps
    • Resources Overview
    • Getting Started with NEON Data
    • Research Support Services
    • Code Hub
    • Learning Hub
    • Science Seminars and Data Skills Webinars
    • Document Library
    • Funding Opportunities
    • Impact Overview
    • Research Highlights
    • Papers & Publications
    • NEON in the News
    • Get Involved Overview
    • Upcoming Events
    • Past Events
    • Research and Collaborations
    • Advisory Groups
    • NEON Ambassador Program
    • Partnerships
    • Community Engagement
    • Work Opportunities

Search

About

  • NEON Overview
  • About the NEON Biorepository
  • Observatory Blog
  • Newsletter
  • Staff
  • FAQ
  • User Accounts
  • Contact Us

Breadcrumb

  1. About
  2. Observatory Blog
  3. Delay in analysis of external lab surface water and groundwater nutrient data: Final update

Data Notification

Delay in analysis of external lab surface water and groundwater nutrient data: Final update

February 3, 2022

This is an update to the previous post concerning external lab surface water and groundwater nutrient data.

All backlog samples have been shipped and are being analyzed by the external lab alongside more recently collected sample on a site-by-site basis. We expect all of the backlog to be published by mid-2022. Going forward, samples will be stored frozen and shipped out every other month in a batch from each Domain. Data will be published approximately 90 days following sample receipt.

The following analytes are part of the backlog and new shipping schedule:

  • nitrate plus nitrite as nitrogen (NO3+NO2 – N)
  • nitrite as nitrogen (NO2 - N)
  • ammonium as nitrogen (NH4 - N)
  • orthophosphate (Ortho - P)
  • total phosphorus (TP)
  • total dissolved phosphorus (TDP)

Users should refer to the swc_externalLabSummaryData table, which is part of the expanded package for both Chemical properties of surface water (DP1.20093.001) and Chemical properties of groundwater (DP1.20092.001), for details of laboratory method detection limits associated with date ranges for previously analyzed data.

Please use the Contact Form for further inquiries; please select DP1.20093.001 (for surface water) or DP1.20092.001 (for groundwater) in the Data Product drop-down list and include the term "RITM0030592" in the body of your request.

Share

Related Posts:

Soil water content and water salinity (DP1.00094.001) algorithm updates

November 9, 2026

Update: Precipitation and Shortwave Radiation tables reinstated in Summary Weather Statistics

November 2, 2026

Soil Temperature (DP1.00041.001) algorithm updates

October 19, 2026

NSF NEON, Operated by Battelle

Follow Us:

Join Our Newsletter

Get updates on events, opportunities, and how NEON is being used today.

Subscribe Now

Footer

  • About Us
  • Contact Us
  • Terms & Conditions
  • Careers
  • Code of Conduct

Copyright © Battelle, 2026

The National Ecological Observatory Network is a major facility fully funded by the U.S. National Science Foundation.

Any opinions, findings and conclusions or recommendations expressed in this material do not necessarily reflect the views of the U.S. National Science Foundation.