Historical Documents

Learn more about NEON's history and the Observatory's design in the documents below.

Title Description Date Published

NEON Cyber Infrastructure: Final Design Review

NEON Final Design Review Presentation: NEON Cyber Infrastructure

November 01, 2009

NEON Airborne Observation Platform: Final Design Review

NEON Final Design Review Presentation: NEON Airborne Observation Platform

November 01, 2009

NEON Fundamental Sentinel Unit: Final Design Review

NEON Final Design Review Presentation: NEON Fundamental Sentinel Unit

November 01, 2009

NEON Project Schedule: Final Design Review

NEON Final Design Review Presentation: NEON Project Schedule

November 01, 2009

NEON Cost Estimation: Final Design Review

NEON Final Design Review Presentation: NEON Cost Estimation

November 01, 2009

NEON Risk Management Overview: Final Design Review

NEON Final Design Review Presentation: NEON Risk Management Overview

November 01, 2009

Workshop Report: On developing a plan for an isotope network within NEON

This is a combined report from two BASIN (Biosphere-Atmosphere Stable Isotope Network) workshops: (1) September 16-17, 2004, Park City, Utah and (2) December 12, 2004, San Francisco, California. Stable isotope ratio analyses at natural abundance levels play a central role in understanding many ecosystem dynamics, patterns, and processes. These analyses are likely to play a central role in aquatic, atmospheric, and terrestrial components of the National Ecological Observatory Network (NEON) now in the planning stages.

September 16, 2004

2008 Members' Meeting: Report from the COO / Project Manager

PowerPoint presentation on the status of the NEON Project given at the 2008 Members' Meeting by the NEON COO/Project Manager

October 16, 2008

2008 Members' Meeting: Report from the CEO

PowerPoint presentation related to the CEO/PI report made at the 2008 Members' Meeting

October 16, 2008

Dear Colleague Letter: 2008 Sep 16

A letter of thanks to the sciencific community for their contributions to the NEON planning and site survey process.

September 16, 2008

Pages

Dialog content.